FingerpostのClosure order

A temporary traffic regulation order in Fingerpost, which closed Station Street for a sewer repair from 11 to 25 October 2026. The order, ACC/TTRO/2026/0412, is complete, and its track shows the stages it passed: draft, consultation, awaiting approval, approved, notices issued, published, active and complete. The line under the title names the officer who raised it and the approver, whose note says the repair could not wait and the diversion was agreed with the bus operator. The map shows the closed length and the diversion. The order closes 185 m of the street under section 14(1) with a 368 m diversion. A duration hint compares the 14 days requested with similar completed works and marks the request longer than usual.
A temporary traffic regulation order in Fingerpost, which closed Station Street for a sewer repair from 11 to 25 October 2026. The order, ACC/TTRO/2026/0412, is complete, and its track shows the stages it passed: draft, consultation, awaiting approval, approved, notices issued, published, active and complete. The line under the title names the officer who raised it and the approver, whose note says the repair could not wait and the diversion was agreed with the bus operator. The map shows the closed length and the diversion. The order closes 185 m of the street under section 14(1) with a 368 m diversion. A duration hint compares the 14 days requested with similar completed works and marks the request longer than usual.

このスクリーンショットについて

Tabs hold the permits, restrictions, consultation, estimate, notices, files and publication for the order. A side panel links its public page and its emails.

Fingerpost:Highway authorities run street works permits, clash checks and road closure orders on one map of their road network. Fingerpostの機能について読む。