Skip to content

For emergencies, call +44 7537 179434 and press 0.

Fingerpost screens

Fingerpost screenshots

All the published screens of Fingerpost. Open one for the full image, its dimensions and a download.

All Fingerpost screenshots

  • The Fingerpost map of a council's road network. The panel on the left finds a street by name or USRN and lists thirteen layers. Permits (37), section 58 restrictions (2), closure orders (6), diversion routes (2), public events (3), incidents (2) and clashes (47) are switched on. Network assets, traffic cameras, traffic flow, traffic incidents, key routes and road collisions are off. Under the heading Your authority's layers are the council's own public rights of way and conservation areas. On the map, permits are drawn along their streets in green and closure orders in purple. Clashes show as orange markers.
    Road network map Fingerpost screenshot

    The layers are drawn over Ordnance Survey data. Any layer can be switched off or shown on its own. The buttons above the map measure a distance, draw a diversion or a sketch, and save the current view.

  • A standard permit for footway reconstruction in Fingerpost, granted and now completed. The status track shows it has passed Submitted, Under assessment, Granted and In progress and reached Completed. Closed is the last step. The permit panel gives the permit and works references, the street with its USRN, the promoter and the activity. It also shows two-way signals as the traffic management, the proposed and actual dates, the assessment deadline and the road category. The decision panel below names the officer who granted the permit and the date, and says one condition was set. A map of the street and an On site panel sit on the right.
    Permit Fingerpost screenshot

    Tabs above the permit hold its conditions, clashes, restrictions, inspections, files, correspondence and timeline. Inspectors serve works starts and stops from a phone. In the On site panel an officer can undo one that was logged in error, and the change goes to Street Manager.

  • The standard Fingerpost dashboard for the signed-in officer's role. Its figures refresh every 30 seconds. Four tiles across the top show a compliance score of 67%, which is the average of the five statutory compliance measures, one overdue assessment, 50 open clashes and two open cases. Below them are the orders awaiting approval, a bar chart of permits by status with 32 granted, and a chart of the last 14 days of activity on permits, orders, cases and emails.
    Dashboards Fingerpost screenshot

    An officer can rearrange the dashboard or email it to someone from the buttons at the top. The permits chart can also be shown as a table.

  • The council's public roadworks site, which Fingerpost publishes under the council's name. Its map page filters the 9 roadworks and closures by when they happen (3 now, 2 this week and 4 later), by type of work, and by street or town. The affected roads are highlighted on the map. The text above it tells residents that a solid line is in place now and a dashed line is coming up.
    Public roadworks map Fingerpost screenshot

    Residents can tap a highlighted road to see what is happening there and when, or switch to the list. The site also has pages for events, consultations, email alerts and applications. Visitors can pick a light or dark theme or follow their system setting.

  • Fingerpost's field app on a phone, open at Works near me. It lists 30 granted and in-progress works. An inspector can search them by street, promoter or reference, or sort them by distance once the phone shares its location. A button labelled Orders on site opens the closures and reopenings. A panel offers to download a map of about 60 MB for places with no signal. The first work in the list is a trunk main valve replacement, on site under two-way signals from 31 October to 12 November 2026.
    Works near me on a phone Full page Fingerpost screenshot

    The bar at the foot of the screen says whether the phone is online and whether anything recorded on it is waiting to be sent.

  • The Today page in Fingerpost, where a street works officer at Anyshire County Council starts the day, here on 17 November 2026. Five counts run across the top: 3 permits awaiting assessment with 1 overdue, 50 open clashes, 3 works in progress with 1 new from Street Manager, 1 order awaiting approval and 1 case awaiting the council's reply. Below, Needs attention lists the work with a score on the right, highest first. A permit for a new fibre duct is eight working days overdue for assessment. A closure order for a fibre duct installation awaits approval, and a permit for a water main renewal is due for assessment in three working days. High-severity clashes on the same street follow.
    Today Fingerpost screenshot

    Each row opens the permit, order or clash it names. The buttons at the top start a new closure order or open the works register.

  • The Planning page in Fingerpost, a schedule of the works on the network over the next 12 weeks. A line at the top says the plan is up to date: planned on 17 November at 09:02, 54 tasks, 23 moved and 129 working days of slip. Filters choose a reference, title or street, the resources and the time span, or show only the moved tasks. Each row gives the works reference, its title and street, and a bar on the calendar coloured by state: as requested, moved by the planner, fixed, or at order stage. A label beside a moved task says how much later it now starts, such as 8 working days later for a link box replacement.
    Planning Fingerpost screenshot

    Tabs switch between the schedule, the resources and the working time. The buttons at the top download the plan or run the planner again.

  • The Clashes page in Fingerpost, under Coordination, listing 50 clashes, all of them open. Each row pairs two records that overlap, such as a hoarding or skip licence against a utility permit, a closure order or an event. It gives the severity, the reason (the same street, or within 25 m of a diversion), the dates of the overlap and the status. Every clash in view is high severity. Links on each row resolve the clash, and some rows also offer collaborative working. Tabs filter by open, acknowledged, resolved and dismissed clashes, and a search box finds a reference, street or title.
    Clashes Fingerpost screenshot

    The buttons at the top record a clash by hand or run the clash check again. Filters on the right narrow the list by status and severity.

  • A temporary traffic regulation order in Fingerpost, which closed Station Street for a sewer repair from 11 to 25 October 2026. The order, ACC/TTRO/2026/0412, is complete, and its track shows the stages it passed: draft, consultation, awaiting approval, approved, notices issued, published, active and complete. The line under the title names the officer who raised it and the approver, whose note says the repair could not wait and the diversion was agreed with the bus operator. The map shows the closed length and the diversion. The order closes 185 m of the street under section 14(1) with a 368 m diversion. A duration hint compares the 14 days requested with similar completed works and marks the request longer than usual.
    Closure order Fingerpost screenshot

    Tabs hold the permits, restrictions, consultation, estimate, notices, files and publication for the order. A side panel links its public page and its emails.